中文  ENGLISH
NEWS & MEDIA
NEWS & MEDIA
The parallel two-way drilling fluid recovery skid has been function test successfully
Release time:2017/11/29 16:18:36 Read:679

     From August 19th to August 24th, our company have processed the functional test of the parallel two-way drilling fluid recovery skid , that is the key part of particle impact drilling system prototype. During this period, we completed the equipment status, signal control system, manual / automatic switch function, PID level control module, etc. and successfully obtained some parameters.
     The experimental results show that the technical specifications of the recovery skid meet the design expectation, and can be operated continuously and reliably. The automatic purification and recovery of the return drilling fluid can be realized, and emergency buffer can be provided under the emergency condition.
      The recovery skid was functional successfully, that provides the process data for the later field test of the particle impact drilling system, and also marks that the prototype is officially entering the testing phase.







Last one:PDC bit is well received
Next article:Particle drilling test achieved stage success